Uploaded image for project: 'UX Product'
  1. UX Product
  2. UXPROD-2363

SRS Performance Improvements

    XMLWordPrintable

    Details

    • Template:
    • Analysis Estimate:
      Medium < 5 days
    • Front End Estimate:
      Very Small (VS) < 1day
    • Back End Estimate:
      XXL < 30 days
    • Confidence factor:
      Low
    • Estimation Notes and Assumptions:
      There are 3 umbrellas included. T-short estimation can be higher then 30 days >60 days
    • Development Team:
      Folijet
    • Calculated Total Rank:
      15
    • PO Rank:
      106
    • Rank: Cornell (Full Sum 2021):
      R1
    • Rank: MO State (MVP June 2020):
      R2

      Description

      Feature for performance improvements for data coming into and going out of SRS.

      Broken into 3 umbrellas:

      Working with a library task force (liaison is Stephen Pampell) to review and finalize requirements

      In addition to Folijet backend devs, will have dev help from William Welling/TAMU

      Metrics that we're trying to meet: Stephen Pampell add preliminary metric goals

        TestRail: Results

          Attachments

            Issue Links

              Activity

                People

                Assignee:
                abreaux Ann-Marie Breaux
                Reporter:
                abreaux Ann-Marie Breaux
                Analysis Estimator:
                Ann-Marie Breaux Ann-Marie Breaux
                Front End Estimator:
                Taras Tkachenko Taras Tkachenko
                Back End Estimator:
                Oleksii Kuzminov Oleksii Kuzminov
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    TestRail: Runs

                      TestRail: Cases