Uploaded image for project: 'UX Product'
  1. UX Product
  2. UXPROD-1383

Ability to roll back a load if problems

    XMLWordPrintable

    Details

    • Template:
      UXPROD features
    • Analysis Estimate:
      Large < 10 days
    • Front End Estimate:
      Medium < 5 days
    • Back End Estimate:
      XXL < 30 days
    • Confidence factor:
      Low
    • Estimation Notes and Assumptions:
      Hide
      I think this is two distinct requirements, a test load and a rollback of a real load being very different things.

      It's not clear if any analysis work has been done already, but a sound estimate would definitely need such an analysis, including thorough considerations about possible technical solutions.

      Given the time constraint, the immediate estimates here are not based on any such serious analysis of the two requirements, so confidence is low.
      Show
      I think this is two distinct requirements, a test load and a rollback of a real load being very different things. It's not clear if any analysis work has been done already, but a sound estimate would definitely need such an analysis, including thorough considerations about possible technical solutions. Given the time constraint, the immediate estimates here are not based on any such serious analysis of the two requirements, so confidence is low.
    • Development Team:
      Folijet
    • Calculated Total Rank:
      61
    • Kiwi Planning Points (DO NOT CHANGE):
      2
    • PO Rank:
      68
    • PO Ranking Note:
      Hide
      preview (UXPROD-669) helps keep this lower priority; aim for Q1 2020; per MM SIG convo, would definitely need batch delete if this is not yet available
      Show
      preview ( UXPROD-669 ) helps keep this lower priority; aim for Q1 2020; per MM SIG convo, would definitely need batch delete if this is not yet available
    • Rank: Chalmers (Impl Aut 2019):
      R4
    • Rank: Chicago (MVP Sum 2020):
      R4
    • Rank: Cornell (Full Sum 2021):
      R2
    • Rank: Duke (Full Sum 2021):
      R1
    • Rank: 5Colleges (Full Jul 2021):
      R3
    • Rank: FLO (MVP Sum 2020):
      R4
    • Rank: GBV (MVP Sum 2020):
      R4
    • Rank: Grand Valley (Full Sum 2021):
      R2
    • Rank: hbz (TBD):
      R4
    • Rank: Hungary (MVP End 2020):
      R1
    • Rank: Lehigh (MVP Summer 2020):
      R4
    • Rank: Leipzig (Full TBD):
      R4
    • Rank: Leipzig (ERM Aut 2019):
      R4
    • Rank: MO State (MVP June 2020):
      R1
    • Rank: TAMU (MVP Jan 2021):
      R1
    • Rank: U of AL (MVP Oct 2020):
      R4

      Description

      Have the ability to completely roll back a load and its resulting actions in SRS, Inventory, MARCcat, Orders, and Invoices, if problems detected.

      See convo in the comments below

        TestRail: Results

          Attachments

            Issue Links

              Activity

                People

                Assignee:
                abreaux Ann-Marie Breaux
                Reporter:
                abreaux Ann-Marie Breaux
                Analysis Estimator:
                Niels Erik Gilvad Nielsen Niels Erik Gilvad Nielsen
                Front End Estimator:
                Niels Erik Gilvad Nielsen Niels Erik Gilvad Nielsen
                Back End Estimator:
                Niels Erik Gilvad Nielsen Niels Erik Gilvad Nielsen
                Votes:
                0 Vote for this issue
                Watchers:
                6 Start watching this issue

                  Dates

                  Created:
                  Updated:

                    TestRail: Runs

                      TestRail: Cases