Details
-
Bug
-
Status: Closed (View Workflow)
-
P3
-
Resolution: Done
-
None
-
-
EPAM-Veg Sprint 12, EPAM-Veg Sprint 13
-
2
-
Vega
Description
- In folio-snapshot as diku_admin
- For a loan with a loan policy that has a fixed due date schedule and a limited number of renewals, and a loan that is already at the allowed due date and maximum number of renewals
- Renew
Expected: Loan fails for two reasons: renewal won't change the due date, and the loan is at the maximum number of renewals. The user is not given the opportunity to override
Actual: Loan fails for two reasons: renewal won't change the due date, and the loan is at the maximum number of renewals. the user is given the opportunity to override.
Notes: Unlike UIU-935, FOLIO will not allow overrides when renewal will not change the due date when using a fixed due date schedule, so I'm classifying this as a different bug.
TestRail: Results
Attachments
Issue Links
- has to be finished together with
-
CIRC-261 Renewal override should prohibited if it wouldn't change the due date
-
- Closed
-
- relates to
-
UIU-791 Renewal overrides: Update Renewal Confirmation window UI (Fixed Due Date Loans)
-
- Closed
-
-
UIU-877 Renewal overrides: single-item failed renewals
-
- Closed
-
-
UXPROD-1609 Loans: Policy Overrides - override non-loanable, multiple renewal failures
-
- Closed
-
-
UXPROD-1847 Loans: Policy Overrides - override multiple renewal failures
-
- Closed
-