Uploaded image for project: 'ui-users'
  1. ui-users
  2. UIU-2130

Renewal succeeds without override when calendar is absent for loan service point

    XMLWordPrintable

Details

    • Bug
    • Status: Closed (View Workflow)
    • P2
    • Resolution: Won't Do
    • None
    • None
    • Vega

    Description

      Overview:
      Steps to Reproduce:

      In IRIS bugfest
       
      User  with permissions: view loans, renew loans, renew loans through override

      Loan L with following characteristics:

      • Loan policy that says item is loanable and renewable, with one of the following characteristics:
        • due date schedule not containing system date if loan policy is set to renew from system date
        • due date schedule not containing current due date if loan policy is set to renew from current due date
      • Item status is checked out, not at maximum number of renewals and has no open requests

      Click on renewal

      Expected Results: Error message - Calendar timetable is absent for requested date

               Override modal is displayed
      Actual Results: Item is renewed according to loan policy as if calendar existed and due date is on an open day
      Additional Information:
      URL:
      Interested parties:

      TestRail: Results

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                cmalmbor Cheryl Malmborg
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  TestRail: Runs

                    TestRail: Cases