Uploaded image for project: 'mod-circulation'
  1. mod-circulation
  2. CIRC-384

Multiple renewal failures: recall-related + other failure reasons

    XMLWordPrintable

Details

    • Story
    • Status: Closed (View Workflow)
    • P2
    • Resolution: Done
    • None
    • 16.6.0
    • EPAM-Veg Sprint 20, EPAM-Veg Sprint 21, EPAM-Veg Sprint 22
    • 5
    • Vega

    Description

      Scenarios

      1. Scenario
        • Given a loan with a loan policy that says it's not loanable, and an open recall request on the item in the loan
        • When a renewal is attempted on the loan
        • Then fail the renewal
          • Show both failure reasons (not loanable, open recall request)
          • Allow override (date picker)
      2. Scenario
        • Given a loan with a loan policy that says it's not renewable, and an open recall request on the item in the loan
        • When a renewal is attempted on the loan
        • Then fail the renewal
          • Show both failure reasons (not renewable, open recall request)
          • Allow override (date picker)
      3. Scenario
        • Given a loan that has reached the maximum number of renewals, and an open recall request on the item in the loan
        • When a renewal is attempted on the loan
        • Then fail the renewal
          • Show both failure reasons (has reached maximum number of renewals, open recall request)
          • Allow override (calculate due date)
      4. Scenario
        • Given a loan with a rolling policy and a fixed due date schedule, and a renew from: date that falls outside the range(s) in that due date schedule, and an open recall request on the item in the loan
        • When a renewal is attempted on the loan
        • Then fail the renewal
          • Show both failure reasons (renewal date falls outside date ranges in rolling loan policy, open recall request)
          • Allow override (date picker)
      5. Scenario
        • Given a loan with a fixed policy and a fixed due date schedule, and a system date falling outside the range(s) in that due date schedule, and an open recall request on the item in the loan
        • When a renewal is attempted on the loan
        • Then fail the renewal
          • Show both failure reasons (renewal date falls outside date ranges in fixed loan policy, open recall request)
          • Allow override (date picker)

      TestRail: Results

        Attachments

          Issue Links

            Activity

              People

                OleksiiMaksymov Oleksii Maksymov
                ecboettcher Emma Boettcher
                Emma Boettcher Emma Boettcher
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  TestRail: Runs

                    TestRail: Cases