Details
-
Story
-
Status: Closed (View Workflow)
-
P3
-
Resolution: Done
-
None
-
None
-
customfield_11100 26172
-
EPAM-Veg Sprint 17, EPAM-Veg Sprint 18, EPAM-Veg Sprint 19
-
8
-
Vega
Description
Scenarios
- Scenario
- Given a loan with rolling loan policy, renew from: due date, and a fixed due date schedule (due date limit), and a due date not falling within the range(s) in the fixed due date schedule
- When a renewal is attempted
- Fail the renewal
- Failure message: Renewal date falls outside date ranges in rolling loan policy
- Allow override (with date picker)
- Scenario
- Given a loan with rolling loan policy, renew from: system date, and a fixed due date schedule (due date limit), and a system date not falling within the range(s) in the fixed due date schedule
- When a renewal is attempted
- Fail the renewal
- Failure message: Renewal date falls outside date ranges in rolling loan policy
- Allow override (with date picker)
- Scenario
- Given a loan with rolling loan policy, renew from: system date, and a fixed due date schedule (due date limit), and a loan date not falling within the range(s) in the fixed due date schedule, and a system date falling within the range(s) in the fixed due date schedule
- When a renewal is attempted on the system date
- Allow the renewal
- Scenario
- Given a loan with rolling loan policy, renew from: due date, and a fixed due date schedule (due date limit), and a loan date not falling within the range(s) in the fixed due date schedule, and a due date falling within the range(s) in the fixed due date schedule
- When a renewal is attempted
- Allow the renewal
- Scenario
- Given a loan with rolling loan policy, renew from: due date, and an alternate fixed due date schedule (due date limit) for renewal, and a due date not falling within the range(s) in the alternate fixed due date schedule
- When a renewal is attempted
- Fail the renewal
- Failure message: Renewal date falls outside date ranges in rolling loan policy
- Allow override (with date picker)
- Scenario
- Given a loan with rolling loan policy, renew from: system date, and an alternate fixed due date schedule (due date limit) for renewal, and a system date not falling within the range(s) in the alternate fixed due date schedule
- When a renewal is attempted
- Fail the renewal
- Failure message: Renewal date falls outside date ranges in rolling loan policy
- Allow override (with date picker)
- Scenario
- Given a loan with rolling loan policy, renew from: system date, and an alternate fixed due date schedule (due date limit) for renewal, and a loan date not falling within the range(s) in the alternate fixed due date schedule, and a system date falling within the range(s) in the alternate fixed due date schedule
- When a renewal is attempted on the system date
- Allow the renewal
- Scenario
- Given a loan with rolling loan policy, renew from: due date, and an alternate fixed due date schedule (due date limit) for renewal, and a loan date not falling within the range(s) in the alternate fixed due date schedule, and a due date falling within the range(s) in the alternate fixed due date schedule
- When a renewal is attempted
- Allow the renewal
Notes Currently, the system is failing renewals for rolling loan policies when the loan date does not fall within the ranges in the due date schedule.
TestRail: Results
Attachments
Issue Links
- blocks
-
UIU-1094 Multiple renewal failures: recall-related + reasons related to due date schedule
-
- Closed
-
- clones
-
UIU-1047 Renewal behavior for rolling loan policy with due date schedule
-
- Closed
-
- defines
-
UXPROD-1847 Loans: Policy Overrides - override multiple renewal failures
-
- Closed
-
- relates to
-
UIU-1100 Show the data picker when renewal date falls outside of date ranges in rolling loan policy
-
- Closed
-