Uploaded image for project: 'mod-circulation'
  1. mod-circulation
  2. CIRC-212

Change renewal failure messages to match requirements

    XMLWordPrintable

Details

    • Bug
    • Status: Closed (View Workflow)
    • P3
    • Resolution: Done
    • None
    • 15.0.0
    • None
    • EPAM-Veg Sprint 9
    • 1
    • Vega

    Description

      This story supports matching requirements described in UIU-724
      Change following messages:
      "loan has reached its maximum number of renewals" -> "loan at maximum renewal number"
      "renewal date falls outside of the date ranges in the limit schedule of rolling loan policy" -> "renewal date falls outside of date ranges in rolling loan policy"
      "renewal date falls outside of the date ranges in the fixed schedule of fixed loan policy" -> "renewal date falls outside of date ranges in fixed loan policy"

      TestRail: Results

        Attachments

          Issue Links

            Activity

              People

                ecboettcher Emma Boettcher
                Tur Dmytro Tur
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  TestRail: Runs

                    TestRail: Cases