Details
-
Bug
-
Status: Closed (View Workflow)
-
P1
-
Resolution: Cannot Reproduce
-
None
-
None
-
-
Vega
-
Morning Glory (R2 2022) Bug Fix
-
TBD
Description
Overview:
Steps to Reproduce:
- Log into MG bugfest as user with checkout privileges
- Find or create a rolling loan policy with a fixed due date schedule with a start date greater than the due date that would be assigned by the rolling date
- In Checkout enter a patron/item that will trigger the loan policy
Expected Results: Loan is assigned the due date of the rolling policy
Actual Results: An error message is displayed: loan date falls outside of the date ranges in the loan policy
Additional Information: Screen shots of the fixed due date schedule, loan policy, calendar and error are attached
URL:
Interested parties:
TestRail: Results
Attachments
Issue Links
- defines
-
UXPROD-3418 Vega - Morning Glory Enhancements/Bugfixes/Tech Debt
-
- Closed
-