Details
-
Bug
-
Status: Closed (View Workflow)
-
P2
-
Resolution: Done
-
None
-
None
-
3
-
Vega
-
Lotus (R1 2022) Bug Fix
-
Not a bug
Description
Overview:
When renewing a loan with a rolling due due date period, but a fixed due date limit, in a subsequent fixed due date period from the one in which it was originally checked out, the due date is reverting to the due date of the original fixed due date period rather than a new due date within the current one.
Steps to Reproduce:
- Log in to Bugfest Lotus and view the following loan: https://bugfest-lotus.int.aws.folio.org/users/be48719d-adc3-445f-ae0d-1a66cce1b012/loans/view/54cef36a-dd61-4f40-8616-76534a6f919c
- Renew the loan
Expected Results:
The loan receives a due date within the current fixed due date schedule period for the applicable loan policy.
Actual Results:
Loan due date is reset to the original fixed due date period's due date.
Additional Information:
Need to try and replicate this in Snapshot, and I had thought there was a previous ticket for this in Kiwi/Juniper, but I can't find it yet.
URL:
Interested parties:
TestRail: Results
Attachments
Issue Links
- duplicates
-
CIRC-1463 Renewing Items Does Not Change Due Date
-
- Closed
-