Uploaded image for project: 'Chalmers'
  1. Chalmers
  2. CHAL-282

holdShelfExpirationDate should honour closed days configured in Exception period in Calendar settings

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Closed (View Workflow)
    • Priority: TBD
    • Resolution: Won't Do
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Template:
    • Story Points:
      5

      Description

      Steps to reproduce

      1. Go to Calendar, click Add a new exception period
      2. Create an exception period which states that the library is closed 2020-03-18 through 2020-03-31
      3. Save the new Exception period
      4. On 2020-03-18, check in an item which has a request

      Expected result

      The standard hold expiration period is 7 days, but since that date falls within the exception period, holdShelfExpirationDate is set to 7 days from now excluding the days closed according to the Exception period (during which the patron will have no possibility of picking up the book). The holdShelfExpirationDate should be something like 2020-04-07.

      Actual result

      The holdShelfExpirationDate is set to 2020-03-25, i.e. 7 days from now, even though this means the patron will have no chance to pick up the book.

        Attachments

          Issue Links

            Activity

              People

              Assignee:
              Unassigned Unassigned
              Reporter:
              lisams Lisa Sjögren (EBSCO)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: